Initial Compliance

Identification and Consideration of Exposure Controls

Implement an Exposure Control Plan (ECP)

The Exposure Control Plan (ECP) should be implemented based on sampling results. Certain control measures may be required when air monitoring results exceed specific exposure thresholds.

How to Use This Document

Complete this form when sampling results indicate that exposure controls, regulated areas, or implementation actions may be required. Use one form for each TSCA-regulated chemical and each task, equipment item, work area, or similar exposure scenario being evaluated.

Duplicate tables or rows as necessary.


Exposure Control Evaluation

Purpose

The purpose of this section is to evaluate potential controls that may reduce or eliminate employee exposure to the chemical, process, or hazard being assessed. Consider each control category and determine whether the control is feasible, effective, not applicable, or requires additional review.

For each control considered, select the appropriate checkbox and provide supporting rationale.

How to Complete the Evaluation

☑ Feasible

Select Feasible if the control can reasonably be implemented at the facility considering:

  • Technical limitations
  • Equipment design
  • Operational requirements
  • Available resources
  • Regulatory requirements

Example: Local exhaust ventilation can be installed at the drum filling station.

☑ Effective

Select Effective if the control is expected to significantly reduce or eliminate exposure.

Example: Enclosing the chemical transfer process will prevent routine employee contact with the material.

☑ Not Feasible

Select Not Feasible if the control cannot reasonably be implemented.

Common reasons include:

  • Physical space limitations
  • Incompatible equipment design
  • Safety concerns
  • Excessive operational disruption

Example: Complete enclosure cannot be installed because operators must visually inspect product quality during processing.

☑ N/A (Not Applicable)

Select N/A when the control does not apply to the operation or exposure scenario.

Example: Ventilation controls are not applicable because no airborne exposure potential exists.

☑ Further Review Needed

Select this option if additional information is required before a determination can be made.

Examples include:

  • Additional exposure monitoring needed
  • Engineering study required
  • Vendor consultation required
  • Cost analysis pending
  • Process changes under evaluation

Rationale / Notes

Provide sufficient information to explain the evaluation decision.

Include, when applicable:

  • Description of the control
  • Expected exposure reduction
  • Limitations or concerns
  • Cost considerations
  • Operational impacts
  • Follow-up actions required

Good Example:
Local exhaust ventilation evaluated for packaging area. Installation is technically feasible and expected to reduce airborne dust concentrations. Engineering review indicates sufficient space is available for ductwork installation.

Poor Example:
Looks good.


Engineering Controls

Engineering controls reduce exposure by physically changing the workplace, equipment, process, ventilation, enclosure, isolation, or transfer methods.

Common Examples

  • Local exhaust ventilation
  • Process enclosure
  • Chemical transfer pumps
  • Closed-loop systems
  • Isolation rooms
  • Automated material handling
  • Equipment guarding
  • Dust collection systems
  • Secondary containment systems
  • Remote operation stations

Evaluation Considerations

  • Can the control be installed?
  • Will it reduce or eliminate exposure?
  • Does it create new safety risks?
  • Will production be impacted?
  • Does maintenance have the resources to support it?

Work Practices and Administrative Controls

Work practice and administrative controls reduce exposure by changing how work is performed rather than modifying equipment or processes.

Common Examples

  • Written operating procedures
  • Restricted access areas
  • Employee training
  • Scheduled maintenance
  • Exposure monitoring programs
  • Housekeeping requirements
  • Permit systems
  • Reduced exposure duration
  • Job rotation
  • Inspection programs
  • Signage and labeling

Evaluation Considerations

  • Will the procedure realistically be followed?
  • Are employees adequately trained?
  • Can compliance be verified?
  • Will exposure reduction be consistent?
  • Are additional inspections required?

Example Entries

Engineering Control #1

☑ Feasible  
☑ Effective  
□ Not Feasible  
□ N/A  
□ Further Review Needed

Rationale / Notes:
Installation of local exhaust ventilation at the powder transfer station is technically feasible and expected to significantly reduce airborne particulate exposure. Maintenance personnel confirmed sufficient access for future servicing.

Administrative Control #1

☑ Feasible  
☑ Effective  
□ Not Feasible  
□ N/A  
□ Further Review Needed

Rationale / Notes:
A written procedure requiring closed containers during transport can be implemented immediately. Operators will be trained during the next safety meeting and compliance will be verified through supervisory inspections.


No Separate MOC Documentation System

If your facility does not maintain a formal Management of Change (MOC) process, complete the information below to document implementation of the control measure, including installation, inspections, training, and personnel responsibilities.

1. Task(s) to Implement Controls

Describe the actions taken to install, implement, or establish the control.

Examples:

  • Installed local exhaust ventilation at bagging station.
  • Added machine guarding to conveyor pinch points.
  • Revised operating procedure SOP-104.
  • Added chemical storage warning signage.

2. Responsible Individual(s)

List the person(s), department(s), contractor(s), or job title(s) responsible for implementing and verifying the control.

Examples:

  • John Smith, Maintenance Supervisor
  • Operations Department
  • ABC Industrial Contractors
  • EHS Manager

3. Installation / Completion Date

Enter the date the control was fully installed, implemented, or placed into service.

Example: 03/15/2026

4. Inspections (What and Where)

Describe any required inspections, monitoring, or verification activities and identify where they will occur.

Include:

  • Equipment or control being inspected
  • Inspection location
  • Inspection frequency
  • Responsible person

Examples:

  • Dust collector inspected monthly in Building A by Maintenance Supervisor.
  • Emergency shower tested weekly in Chemical Storage Room.

5. Training of Users and Maintenance Personnel

Document any training provided to employees who operate, inspect, maintain, or are otherwise affected by the control.

Include:

  • Who was trained
  • Training topic
  • Training date
  • Trainer

Examples:

  • Operators trained on new ventilation system operation on 03/20/2026.
  • Maintenance staff trained on filter replacement procedures.

Other / Notes

Record any additional information relevant to implementation, including:

  • Delays or deviations
  • Follow-up actions
  • Temporary controls
  • Supporting documents
  • Verification of effectiveness

Examples:

  • Air monitoring completed after installation and confirmed exposure levels below action limits.
  • Follow-up inspection scheduled for six months after implementation.